CLEANING Engineering
ToolFusion / Bottle Washer / Engineering Tools

Project Tool: Bottle Washer Sanitary Compliance Verification per 3-A SSI 10-02

Specification & Integration Verification

F6 Composition for Bottle Washer Sanitary Compliance Verification per 3-A SSI 10-02

● Not Golden Verified ● Project Trust Verified Runnable: 6 / 6 steps
VERIFIED SCOPE
○ Compare Ra measurement against 3-A limit PASS / FAIL capable Runnable
○ Check crevice depth against 3-A limit PASS / FAIL capable Runnable
○ Compute width-to-depth ratio and verify ≤ 2.0 CALCULATION Runnable
○ Verify width-to-depth ratio ≤ 2.0 PASS / FAIL capable Runnable
○ Calculate minimum thermal hold time CALCULATION Runnable
○ Verify t_min meets 3-A minimum duration requirement PASS / FAIL capable Runnable
⚠ This tool does not currently verify Ra_Threshold_Verification, CIP_Parameter_Compliance_Verification, Rinse_Water_Purity_Assessment, Microbial_Swab_Compliance_Assessment.
PROJECT INPUTS

Runnable deterministic steps: 6 / 6. Enter the project conditions used by this verification workflow. Prefilled values (12/12 inputs) are demonstration inputs, not recommended design values.

01Step 1: Compare Ra measurement against 3-A limitValidation Rule
µm
02Step 2: Check crevice depth against 3-A limitValidation Rule
mm
03Step 3: Compute width-to-depth ratio and verify ≤ 2.0Formula
mm
mm
mm
mm
04Step 4: Verify width-to-depth ratio ≤ 2.0Validation Rule
dimensionless
05Step 5: Calculate minimum thermal hold timeFormula
log10
min
log10
min
06Step 6: Verify t_min meets 3-A minimum duration requirementValidation Rule
min
Deterministic calculation · Results become stale when engineering inputs change.
ToolFusion Engineering Network

ToolFusion Engineering Network

Access thousands of engineering calculators, standards, and design tools. Join the ToolFusion network for comprehensive engineering resources.

Explore ToolFusion

ENGINEERING EVIDENCE

Golden Coverage0 / 6
Project Trust11 / 11 PASS
RuntimeDeterministic
Components0 small tools, 6 steps

SCOPE & LIMITATIONS

NOT CURRENTLY VERIFIED
○ Ra_Threshold_Verification
○ CIP_Parameter_Compliance_Verification
○ Rinse_Water_Purity_Assessment
○ Microbial_Swab_Compliance_Assessment
These capabilities are outside the current verified workflow.

HOW THIS VERIFICATION WORKS

  1. Step 1: Compare Ra measurement against 3-A limit — compares engineering inputs against deterministic thresholds and produces a PASS or FAIL decision.
  2. Step 2: Check crevice depth against 3-A limit — compares engineering inputs against deterministic thresholds and produces a PASS or FAIL decision.
  3. Step 3: Compute width-to-depth ratio and verify ≤ 2.0 — performs a deterministic calculation from the provided inputs. No acceptance criterion is applied; the result is CALCULATED only.
  4. Step 4: Verify width-to-depth ratio ≤ 2.0 — compares engineering inputs against deterministic thresholds and produces a PASS or FAIL decision.
  5. Step 5: Calculate minimum thermal hold time — performs a deterministic calculation from the provided inputs. No acceptance criterion is applied; the result is CALCULATED only.
  6. Step 6: Verify t_min meets 3-A minimum duration requirement — compares engineering inputs against deterministic thresholds and produces a PASS or FAIL decision.

This tool coordinates 4 validation steps and 2 calculation steps. The overall engineering decision uses ALL_REQUIRED_VALIDATION_PASS aggregation: only validation steps contribute to the pass/fail outcome; calculation steps produce data only.

METHODS & EQUATIONS

All formulas are resolved from canonical runtime definitions and executed deterministically by the client-side engine.

Step 1: Compare Ra measurement against 3-A limit

Validation Rule
Ra_meas <= 0.8 [engineering_standard:3-A_SSI_10-02_2022_Edition_]

Step 2: Check crevice depth against 3-A limit

Validation Rule
d_c <= 0.25 [engineering_standard:3-A_SSI_10-02_2022_Edition_]

Step 3: Compute width-to-depth ratio and verify ≤ 2.0

Formulaw_c/d_c

Step 4: Verify width-to-depth ratio ≤ 2.0

Validation Rule
w_d_ratio <= 2 [engineering_standard:3-A_SSI_10-02_2022_Edition_]

Step 5: Calculate minimum thermal hold time

FormulaLR*D_82

Step 6: Verify t_min meets 3-A minimum duration requirement

Validation Rule
t_min >= 3 [engineering_standard:3-A_SSI_10-02_2022_Edition_]

UNDERSTANDING THE RESULTS

PASS
A proven validation criterion passed. The engineering input satisfies the deterministic threshold.
FAIL
A proven validation criterion failed. The engineering input does not satisfy the deterministic threshold.
CALCULATED
A deterministic calculation completed, but no acceptance criterion exists for this step. CALCULATED does NOT mean PASS.
RESULT NOT VALID
Runtime executed but engineering validity requirements were not met.
INCOMPLETE
Required inputs or workflow steps are incomplete.

The overall decision reflects only validation steps. Calculation steps produce numerical results without pass/fail claims.

WHEN TO USE THIS TOOL

  • When deterministic Bottle Washer engineering verification is needed for project-specific conditions.
  • For validation of Compare Ra measurement against 3-A limit (Step 1).
  • For validation of Check crevice depth against 3-A limit (Step 2).
  • For calculation of Compute width-to-depth ratio and verify ≤ 2.0 (Step 3).
  • For validation of Verify width-to-depth ratio ≤ 2.0 (Step 4).
  • For calculation of Calculate minimum thermal hold time (Step 5).
  • For validation of Verify t_min meets 3-A minimum duration requirement (Step 6).
  • For deterministic pre-checks before formal engineering review or submission.

When NOT to use this tool: This tool does not replace laboratory testing, formal engineering analysis by a licensed professional, or code-compliance certification. It performs deterministic threshold comparison and calculation only.

ENGINEERING FAQ

What does this verification tool check?

This tool performs 6 deterministic engineering steps: (1) Compare Ra measurement against 3-A limit, (2) Check crevice depth against 3-A limit, (3) Compute width-to-depth ratio and verify ≤ 2.0, (4) Verify width-to-depth ratio ≤ 2.0, (5) Calculate minimum thermal hold time, (6) Verify t_min meets 3-A minimum duration requirement.

What does a PASS result mean?

A PASS result means the validation step's deterministic threshold comparison was satisfied. It does not constitute laboratory certification or code compliance.

What does a CALCULATED result mean?

A CALCULATED result means the deterministic calculation completed, but no acceptance criterion is applied to this step. CALCULATED does NOT mean PASS.

What is not currently verified by this workflow?

Capabilities not currently verified include: Ra_Threshold_Verification, CIP_Parameter_Compliance_Verification, Rinse_Water_Purity_Assessment, Microbial_Swab_Compliance_Assessment.

How many steps are golden verified?

0 out of 6 steps have been verified with deterministic golden test cases.

COMPONENT TOOLS

This workflow currently contains no bound executable Small Tools. Steps are defined by engineering methods and reference materials.

ValidationWorkflow StepVerify surface roughness compliance per 3-A SSI 10-02 §4.3.2
ValidationWorkflow StepAssess weld geometry conformity to 3-A SSI 10-02 §4.2.3 crevice limits
CalculationWorkflow StepAssess weld geometry conformity to 3-A SSI 10-02 §4.2.3 crevice limits
ValidationWorkflow StepAssess weld geometry conformity to 3-A SSI 10-02 §4.2.3 crevice limits
CalculationWorkflow StepDetermine minimum hold time for thermal validation of CIP final rinse at 82°C
ValidationWorkflow StepDetermine minimum hold time for thermal validation of CIP final rinse at 82°C